The Beastie was built a few months before the Bush Beast, prefabricated on site and assembled like a giant construction kit out of 350,000 board feet of imported Southern Yellow Pine and held together with steel bolts and nails. The Beastie took 6 months to build at a cost of $1 million and was built to last 40 years.
16 photos on this page
Looking up to the Beastie from next to Silly Stix, 19 June 1985Games near the Beastie exit, 19 June 1985Construction of the Beastie entrance building (that you would walk through), 19 June 1985The Beastie is taking shape, 27 June 1985The Beastie station, 27 July 1985More of the games near the Beastie exit, 19 August 1985Looking up at the Beastie from next to Silly Stix, 19 August 1985Beastie Entrance in foreground, with games in the background, 7 September 1985The Beastie, 7 September 1985Looking at Quickdraw’s Cafe from near the ball house with Beastie in the background. 7 September 1985Dick Dastardly’s Flying Circus, centre right, with Carousel back centre and HB toilets back right. The Beastie standing behind all of it. 27 September 1985Facade on the entrance to the Beastie is being finished, 27 September 198527 September 1985Looking across Magilla Gorilla’s towards Balloons and the Beastie, 28 September 1985This is the Beastie Exit Ramp, 28 September 1985Final touches being made to the Beastie Entrance. The supports for the sign have gone up. 29 November 1985
Got a Wonderland story or photos to share?
Join us on Facebook - share memories, photos and stories of Australia's Wonderland with thousands of other fans.