Australia’s Wonderland was built between June 1984 and December 1985 at Eastern Creek in Sydney’s west, beside Wallgrove Road and the F4 Freeway, now the M4. The 219-hectare site had been grazing land of the Minchinbury Estate and, in the Second World War, part of the Wallgrove Army Camp; its earlier history is on the Before Wonderland page. The park was financed by the NSW State Superannuation Board (33.75%), James Hardie Industries (23.75%), Taft Broadcasting (23.75%) and Leighton Holdings (18.75%), with Taft as managing partner and the Kings Entertainment Company managing the park on Taft’s behalf. It opened on 7 December 1985, when Premier Neville Wran turned on the park’s waterfall alongside Yogi Bear to signal its opening.
The land was zoned 3(k) Entertainment and Tourism under Blacktown Local Environmental Plan No. 65 on 4 November 1983, and Development Consent No. 013166 was issued on 1 March 1984. Premier Wran launched the groundbreaking ceremony on 8 June 1984; construction began that month and created nearly 500 jobs in Western Sydney. Over the following 18 months the paddocks became a theme park of themed buildings, major rides, waterways and landscaped gardens, with a car park of about 30 hectares for 6,000 vehicles. The Bush Beast was built between 1 April and 5 November 1985. On 8 May 1985 the Mt Druitt District Star reported the coaster frame up, the Beastie‘s frame complete and the Tooheys Tall Ship arrived, with the park still planning to open in early 1986.
The dated construction photos on this site run from 22 August 1984 to 29 November 1985: 1,158 photos over 55 days, laid out day by day on the Construction Timeline, which sits with the park’s other timelines on the Wonderland Timeline page. The three lands that opened with the park, Goldrush, Medieval Faire and Hanna-Barbera Land, each have a construction photo page here:
Rides built for the opening
Construction photos of the rides and attractions that opened with the park in December 1985:
- Bush Beast construction
- Snowy River Rampage construction
- Tooheys Tall Ship construction
- The Jousting Ring construction
- Bounty’s Revenge construction
- Wizard’s Fury construction
- Dragon’s Flight construction
- Sea Demon construction
- The Beastie construction
- Boo Boo’s Balloon Race construction
- Magilla Gorilla’s Flotilla construction
- Scooby’s Silly Stix construction
Later additions
Rides and areas added after the opening also have construction or installation pages:
- The Beach construction (opened 4 December 1988)
- Zodiac construction (opened 1989)
- Transylvania construction and The Demon construction (opened 1992)
- Space Probe construction (opened 4 November 1995)
- Skyrider installation (1997)
Construction in the news
- Wonderland Update #1, press release, December 1984
- Whoosh, and up she goes, 26 April 1985
- The frame goes up for new coaster, Mt Druitt District Star, 8 May 1985
- Wonderland rises up from suburbia, 16 July 1985
- Hair raising Beastie is ready to roll, 15 August 1985
- Sneak Preview of Wonderland, press release, 17 September 1985
- Leighton Staff News, October 1985
Got a Wonderland story or photos to share?
Join us on Facebook - share memories, photos and stories of Australia's Wonderland with thousands of other fans.
Join Wonderland History on Facebook →